- Published
- Scaffolding
- Recognised
- £500 (Scaffolding rate)
- GET2721
This training standard covers the structured training requirements for an operative to safely and correctly erect and dismantle system scaffold products in accordance to manufacturers instructions. This training standard was previously held under the occupational area Working at Height.
- Published
- Working at height
- Recognised
- £500 (Scaffolding rate)
- GET2720
This training standard covers the training requirements for an operative, as a member of a team, to erect, alter and dismantle tube and fitting scaffold structures safely and in their correct sequence. This training standard was previously held under the occupational area Scaffolding.
- Published
- Scaffolding
- Recognised
- £500 (Scaffolding rate)
- GET2723
This standard covers the training requirements for an operative to be able, as a member of a team, to correctly interpret scaffold drawings. The operative should also be able to erect, alter and dismantle the system scaffolds safely and in their correct sequence according to manufacturers' instructions. This training standard was previously held under the occupational area Working at Height.
- Published
- Working at height
- Recognised
- £500 (Scaffolding rate)
- GET2722
This standard covers the training requirements for an operative to be able to interpret scaffold drawings. The operative should also be able, as a member of a team, to erect, alter and dismantle the scaffolds safely and in their correct sequence. This training standard was previously held under the occupational area Scaffolding.
- Published
- Scaffolding
- Recognised
- £240 (Tier 3)
- GET2656
This training is tailored to deliver the knowledge and management skills required in contract scaffolding.
- Published
- Working at height
- Recognised
- £120 (Tier 3 – refresher)
- GET0238
This standard covers the training requirements for a scaffolding supervisor or manager to maintain and refresh their skills and knowledge in the different types of scaffolds. This training standard was previously held under the occupational area Scaffolding.
- Published
- Working at height
- Recognised
- £140 (Tier 2)
- GET1314
This standard covers the training requirements for an operative to be able to safely and correctly inspect system scaffolds in accordance to manufacturers' instructions. This training standard was previously held under the occupational area Scaffolding.
- Published
- Working at height
- Recognised
- £140 (Tier 2)
- GET0236
This standard covers the skills and knowledge for the safe use of the system scaffold product, in accordance with the manufacturer’s instructions. This training standard was previously held under the occupational area Scaffolding.
- Published
- Plant hire and sales
- Assured
- £140 (Tier 2)
- GET2589
Mobile Towers, also known as Scaffold Towers or Alloy Towers, are an integral part of the hire industry. These structures are a key item for working at height. This Standard addresses the correct inspection, supply and safe handling of Towers incorporating PUWER, WAH, MHASAWA, Lead Body and Manufacturers recommendations and guides.