- Published
- Plant short duration training
- Recognised
- £240 (Tier 3)
- GET0815
Full details of this standard will be published shortly
- Published
- Civil engineering
- Assured
- £60 (Tier 1)
- GET3007
The purpose of this standard is to provide the delegate with the knowledge to support the following: principles of reinforcing concrete including but not limited to pre-cast, post-tension; storing different types and quality of steel; methods used to determine cover for rebar; read and decipher information from rebar drawings and schedules covering 3D formats generated from design software; methods of tying and when different ties are used; risk awareness and hazard recognition and mitigation; deciding between pre-fabrication and in situ steelfixing; how to read steelfixing drawings and schedules; how to prefabricate a small ground beam from a drawing and schedule; pre-pour, placement and post-placement inspections.
- Published
- Civil engineering
- Assured
- £30 (Tier 1 - refresher)
- GET3008
The purpose of the Steelfixing introduction – refresher course is for delegates who have previously passed the full Steelfixing introduction course or subsequent refresher course and can provide proof of attendance.
- Published
- Interior systems
- Assured
- £60 (Tier 1)
- GET2704
The purpose of this standard is to provide the candidate with practical knowledge and skills required to work safely using stilts.
- Published
- Wood floor installation
- Assured
- £140 (Tier 2)
- GET1865
The purpose of training delivered against this standard is to provide delegates with an introduction to the installation of strip and plank wooden floors using approved methods in commercial and domestic environments.
- Published
- Heritage (roofing)
- Assured
- £140 (Tier 2)
- GET2551
This standard focuses on the use and application of the underpinning historical, technological and theoretical knowledge and the requisite practical skills to undertake the correct evaluation and selection of materials, tools, equipment and craft practices relevant to the stripping existing roof slating and tiling coverings.